Work

Four builds, live and in daily use

Clients are not named. Each build is described by sector and size, with what was built and how long it took to go live.

  • 14 days

    From signed specification to live: production scheduler for a UK chemicals manufacturer, about £50m turnover.

  • 11 days

    From signed specification to live: nightly enrichment for a UK wholesaler, about £7m turnover.

  • 8 days

    From signed specification to live: AI visibility layer for a UK wholesaler, about £10m turnover.

Source: Sysgraft build records. Each figure is the time from the signed specification to live software.

Bespoke app

Production scheduler

A UK chemicals manufacturer, about £50m turnover

Before

Production was scheduled in a legacy Windows tool and an Excel workbook.

What was built

A bespoke production scheduling application that replaced both, connected in both directions with the company’s ERP. Every field it writes to the ERP was agreed in the specification.

Live
14 days after the signed specification
Bought by
The production scheduling team
System integration

Nightly enrichment

A UK wholesaler, about £7m turnover

What was built

Every night it enriches the customer records in the ERP against Companies House data, scores spend potential, flags financial risk, and writes back only the agreed fields.

Live
In 11 days
Bought by
The managing director
AI layer

AI visibility layer

A UK wholesaler, about £10m turnover

What was built

Questions answered across the company’s systems, with every use of AI on the record.

Live
In 8 days
Bought by
The managing director

“Distinct positive impact on our visibility of every corner of the business including AI usage, but even more importantly the ability to make decisions quickly has contributed to recent sustainable growth.”

Managing Director, UK wholesaler, about £10m turnover
Bespoke app

Doctilla

Curavest’s own ISO 9001 quality management platform

Designed and built by Sysgraft, and used in Curavest’s quality work: corrective actions, nonconformities, supplier issues and audits in one place.

It is the one build named here, because it belongs to Curavest. Karl Pallister, a Curavest consultant, is its technical lead.

doctilla.co.uk

Start with the free two-hour workshop

Most Sysgraft work begins with Curavest’s Operational Improvement Workshop: two hours on one problem that keeps coming back, on site or on Teams. No obligation, and no records needed. If the answer turns out to need software, that is a separate decision, for later.