Production scheduler
Production was scheduled in a legacy Windows tool and an Excel workbook. A bespoke production scheduling application that replaced both, connected in both directions with the company’s ERP. Every field it writes to the ERP was agreed in the specification.
Live 14 days after the signed specification. Bought by the production scheduling team.